Looking at the
front of the building. Workers continue installing the roof.
Soon steel studs will be on site to begin process of closing
in the building.
|

This will become
the main entry filled with glass and four sets of doors.
You can see the covered entry taking shape.
|

This is the side
entrance the entire area will be a glass bay window. Elevator
will be at this entrance. To the right is the lobby above
is the worship center and below is the children's area. Above
area is the steel frame for the floor of the adult level.
|

Looking down the
hallway leading into the children's level. This area has 14
large class rooms for 500 children. This area will also house
main restrooms. |

This is the the
main children's hallway. There will a reception center at
the beginning of the hallway. |

This is looking
down into the lower basement which will be space for 130 junior
high students. |

Looking across main
lobby. There will be a large welcome center and several areas
for coffee service. Stairs will lead up to the worship center. |

Worship center level.
Additional Lobby is around the back of the worship center
to the left the main lobby can be seen. Stepped iron is frame
for the balcony. |

Looking into the
worship center from what will become the main doorway. Balcony
can be seen above and the stage at front. |

Shot of balcony.
Balcony wraps around back of the worship center. Above balcony
is the adult classroom area. |

Looking at main
stage from Audio Visual booth. Rooms above stage are for mechanical
and projection rooms for the screens. Large screens will be
on both sides of the stage. Rooms behind stage will become
a music warm up room and a classroom. |

Looking from stage
to the back of the sanctuary. You can see the wrap around
balcony and adult classroom level. Ceiling trusses can be
seen and are 15 feet in height. This area will seat 1,500
people. |